Early access— we're taking a limited number of jobs this month.

Managed UK grid-connection paperwork

Commercial EV & heat-pump grid paperwork, prepared for you.

Outsource the DNO application. Send us one stuck job and we prepare a submission-ready Connection Pack for commercial EV charger and heat-pump installs — DNO identified, evidence mapped — for your qualified engineer to review and sign off. Turnaround target 48 hours once evidence is complete, payment has cleared and reviewer capacity is confirmed.

  • No account needed
  • Scope & price confirmed first
  • Early access, limited slots
✓ Reviewer sign-off
Commercial EV-charger installer on site with a tablet, beside a row of grid-connected chargers.

Connection Pack

Ready
Turnaround target48 hours

Illustrative project scene; not a customer site, DNO approval or evidence of a completed submission.

Packs prepared for submissions across UK DNO regions

UK Power NetworksNational Grid Electricity DistributionSP Energy NetworksSSENNorthern PowergridElectricity North West

Direct service answers

What PermitGrid does—and what it does not do

What is PermitGrid?

Direct answer: PermitGrid prepares commercial EV-charger and heat-pump DNO application packs for UK installers and project teams. It organises facts, evidence, forms and open points for qualified review before submission.

Which pack fits which job?

The £495 pre-check identifies the likely route and evidence gaps. The £950 full commercial EV pack adds the evidence map and reviewed submission-ready pack. Complex, fleet or multi-site work starts from £1,500 after scope confirmation.

Does PermitGrid guarantee approval?

No. PermitGrid does not certify electrical design, provide legal advice or guarantee DNO approval. “Submission-ready” means the agreed pack passed PermitGrid's evidence and reviewer checks.

How it works

Three steps from stuck job to signed-off pack

01

Send us one stuck job

Company, site, equipment and the blocker. Two minutes. No account.

02

We collect facts & flag gaps

We map the DNO, list the evidence your submission needs and tell you exactly what is missing.

03

You get a submission-ready pack

We organise and evidence-check the pack, then a named qualified reviewer signs off the route and open points before release.

What's included

What's in a Connection Pack

A Connection Pack organises the project facts, evidence, forms and open points needed for the identified route, then passes through qualified review. “Submission-ready” does not mean DNO approval or permission to energise.

Start a job

Want to see one first? View a sample Connection Pack (PDF) — a fully worked specimen.

Illustration of a reviewer and installer checking a grid-connection schematic and project documents.

Illustrative review scene. See the specimen Connection Pack for a clearly labelled example of the document output.

  • DNO identified & confirmed
  • Evidence checklist for this job
  • Load & capacity fact sheet
  • Missing-evidence flags
  • Submission-ready forms organised
  • Named qualified reviewer sign-off

Pricing

Simple, per-pack pricing

Fixed price per pack. We confirm scope before any work starts — no surprises.

Single pre-check pack

One job, de-risked before you commit

£495per pack
  • Likely DNO identified and reviewed
  • Evidence checklist for your job
  • Missing-evidence flags
  • 48-hour target after evidence and payment
Start with this pack
Most popular

Full commercial EV pack

With DNO evidence map

£950per pack
  • Everything in the pre-check
  • Full DNO evidence map
  • Submission-ready reviewed pack
  • Load and capacity fact sheet
Start with this pack

Multi-charger / fleet

Landlord, fleet, solar and battery

£1,500+per pack
  • Multi-charger or multi-site scope
  • Landlord and fleet coordination
  • Solar and battery evidence
  • Priority handling
Start with this pack

No account, no upfront payment

Send the job first. We confirm scope and a fixed price before any work starts.

Qualified review before release

A named reviewer signs off the route and open points before the pack reaches you.

48-hour turnaround target

Once evidence is complete, payment has cleared and reviewer capacity is confirmed.

Start a job

Upload one stuck job

Give us the facts and the blocker. We'll come back with scope and a confirmed price before any work starts.

  • Two minutes, no account

    Just the job facts and what’s stuck.

  • We reply with scope & price

    Nothing charged until you confirm.

  • Human review required

    Before anything goes to a submission.

Up to 5 PDF or image files, 10MB each. Do not upload passwords, payment details or identity documents.

No payment taken now. We confirm scope and price before any work starts. Human review required before submission.

FAQ

DNO application questions

What is a PermitGrid Connection Pack?

A Connection Pack organises the project facts, evidence, forms and open points needed for the identified DNO route, then passes through qualified review. “Submission-ready” means checked and reviewed — not DNO approval or permission to energise.

Do you submit the DNO application for us?

No. We prepare and evidence-check the pack. Your authorised installer or qualified engineer reviews it, signs where required and submits. We prepare paperwork; we do not certify electrical design.

Can I outsource the whole DNO application paperwork?

Yes — that is what PermitGrid is for. Send one stuck job and we handle the DNO identification, evidence chase and pack preparation as your done-for-you paperwork desk, with a named reviewer before submission.

Which DNO regions and job types do you cover?

All GB distribution regions — UK Power Networks, National Grid Electricity Distribution, SP Energy Networks, SSEN, Northern Powergrid and Electricity North West — for commercial EV charger and heat-pump grid connections.

Is the 48-hour turnaround guaranteed?

No. It is an early-access target to produce the reviewed pack once the required evidence is complete, payment has cleared and reviewer capacity is confirmed. DNO decision times are separate and set by the network operator.

Popular: Commercial EV charger DNO application · G99 application service · Fleet & depot EV grid connection · Do I need a DNO application?